ISSN 3080-8065(Print)
ISSN 3080-8073(Online)
版权信息 · Copyright

     加入编委 / 副主编 / 同行评议专家
ISSN 3080-8065(Print)
ISSN 3080-8073(Online)

CODEN:JKYGC5
国际标准连续出版物标识符·全球唯一标识符
分配机构:美国化学文摘社(CAS)
DOI前缀:
https://doi.org/10.66106/jkygc5
国图集团 CIBTC
进口备案刊号:G015Z101

索引 检索 存档(Global Indexing)
本刊入选以下全球权威数据库,致力于研究成果的全球化无障碍传播。

CNKI(中国知网,申请中)
CNKI Open(中国知网·开放平台,申请中)
Wanfang Data(万方数据,中国,更新中)
CQVIP(维普期刊网,中国)
CQVIP(中文期刊服务平台,中国)
RCCSE(中国学术期刊目录,武汉大学)
CJWK(长江文库,中国)
BOOKAN(博看,中国)
591adb(中邮阅读·万章期刊,中国)
Baidu Scholar(百度学术,中国)
Baidu Baike(百度百科,中国)
ICI(哥白尼期刊数据库,波兰)
EuroPub(欧洲学术出版数据库,英国)
MDPI scilit(科学与学术数据库,瑞士)
Crossref(交叉引用,美国)
Semantic Scholar(语义学术,美国)
OpenAlex(全球开源学术平台,加拿大)
ACADEMIA.EDU(学术界,美国)
OUCI(开放乌克兰科学,乌克兰)
WorldCat(世界编目数据库,美国)
Scite(智能引文分析数据库,美国)
The Lens(透镜学术,澳大利亚)
OpenAIRE(开放学术发现门户,欧洲)
Google Scholar(谷歌学术,美国)
DOI(数字对象唯一标识符,英国)
Portico(数字存储库,美国)
J-Gate(开放获取期刊门户,印度)
ResearchGate(研究之门,德国)
Research Commons(科睿唯安,美国)
Socolar(开放获取资源检索,中国,更新中)
Sci Online(科学在线,中国澳门)
OALib(开放存取资源图书馆,美国)
EZB(电子期刊图书馆,德国,申请中)
Road(开放科学学术资源,法国)
ISI(国际科学索引平台,阿联酋迪拜)
ASCI(亚洲科学引文索引,美国)
ESJI(欧亚科学期刊索引,哈萨克斯坦)
ResearchBib(研究者索引,日本)
SPI-Hub™(范德比尔特大学,美国)
SJIF(科学期刊影响因子,印度)
RJIF(研究期刊影响因子)
COSMOS(期刊评价指标,印度)
LivRe!(开放期刊门户,巴西)
KIND CONGRESS(阿塞拜疆)
Journament(质量评估与索引)
IP Indexing(ip索引)
Magzter(跨平台数字期刊,美国)
SlideShare(知识共享平台,美国)
SCRIBD(在线图书馆,美国)
Yahoo! Search(雅虎,美国)
Microsoft Bing(微软学术,美国)
LibKey(学术文献快捷获取工具)
R Discovery(研究者发现平台,印度)
Enterscholar(恩特学术)

规划申请

Scopus 爱思唯尔·斯高帕斯(荷兰)

DOAJ 开放获取期刊目录(瑞典)

EBSCO 学术文献数据库(美国)

OAJ 全球OA期刊索引(中国)
ProQuest 科睿唯安(美国)
RePEc 经济研究文献数据库(美国)

Editing and Publishing
Quest Press Limited
Address
Unit D, 7th Floor, No. 19, Rua de Pa̍k-chiông Vai, Macau
Telephone
+853 6881 9699
Email
QuestPress@hotmail.com
Web site
https://jzkx.scionline2025.com

  往期阅览 · All Issues-> 2025年 · 2025  
建筑科学与工程研究2025年第1卷第3期第43-46页,pISSN 3080-8065、eISSN 3080-8073 发布者:Quest Press 发布日期:2026/3/24
Open Access 浏览295

 

合同视角下武易高速公路土建劳务合作风险分担研究


常清

云南长基工程建设有限公司,云南昆明,650000

摘要:武易高速公路建设规模大、施工周期长,土建劳务合作作为项目推进的核心环节,其风险分担的科学性直接影响项目成败与劳务双方权益。本文从合同视角切入,聚焦武易高速公路土建劳务合作场景,系统探讨风险分担的意义、目的与实施策略。研究指出,合理的风险分担可保障劳务双方合法权益,助推施工高效推进,完善行业管理体系。其核心目的在于通过合同明确风险责任边界、提升整体防控能力,最终实现多方共赢。基于此,本文提出构建科学风险评估机制、细化合同条款明确分担比例、建立动态监控调整体系等策略。研究成果可为武易高速公路项目优化劳务合作管理提供直接参考,也为同类高速工程的劳务风险管控提供合同层面的实践借鉴,助力提升高速公路建设领域劳务合作的规范化水平。

关健词:合同视角;武易高速公路;土建劳务;合作;风险分担
Research on Risk Sharing in Civil Engineering Labor Cooperation for the Wuyi Expressway from a Contract Perspective

Qing Chang

Yunnan Changji Engineering Construction Co., Ltd.,Kunming Yunnan 650000,China

Abstract: The construction of the Wuyi Expressway is characterized by its large scale and long duration. Civil engineering labor cooperation, as a core component of project advancement, relies on the rationality of risk sharing, which directly influences project success and the rights of both labor parties. This paper adopts a contract perspective, focusing on the context of civil engineering labor cooperation for the Wuyi Expressway, and systematically explores the significance, objectives, and implementation strategies of risk sharing. The study indicates that reasonable risk sharing can protect the legitimate rights and interests of both labor parties, promote efficient project progress, and improve industry management systems. Its core objectives include clarifying risk responsibility boundaries through contracts, enhancing overall risk prevention capabilities, and ultimately achieving win-win outcomes for all stakeholders. Based on this, the paper proposes strategies such as establishing a scientific risk assessment mechanism, refining contract terms to specify sharing proportions, and implementing a dynamic monitoring and adjustment system. The research findings can provide direct references for optimizing labor cooperation management in the Wuyi Expressway project, as well as practical guidance at the contract level for risk control in similar high-speed engineering projects. This contributes to enhancing the standardization of labor cooperation in the field of expressway construction.


Keywords : Contract perspective; Wuyi Expressway; Civil engineering; Labor cooperation; Risk sharing


参考文献
[1]郭思延.基于合作博弈视角的工程总承包联合体利益分配研究[D].福建农林大学,2024.
[2]杨荇.基于银行视角的高铁 PPP 模式风险分担机制研究[D].北京交通大学,2023.
[3]张宽.公共租赁住房 PPP 项目风险分担研究[D].中南财经政法大学,2021.
[4]严玲,王帅,严敏.全过程风险分担视角下合同柔性的结构维度与量表开发[J].重庆大学学报(社会科学版),2021,27(02):94-108.
[5]刘柳.风险分担对承包人尽善履约行为的影响[D].天津理工大学,2019.
论文收录证明 / 文献检索报告
Document Retrieval Certificate / Proof of Publication Indexing
作者贡献声明 / 贡献确认书
Author Contribution Statement / Certificate of Authorship Contribution
同行评审报告 / 评审意见
Peer Review Report / Peer Review Comments
利益冲突
Conflict of Interest
作者声明不存在任何利益冲突。
The author declares no conflict of interest.
版权声明
Copyright Statement
本文采用知识共享“署名 4.0 国际”许可 (CC BY 4.0) 进行许可。许可协议详情请访问: https://creativecommons.org/licenses/by/4.0/
This article is licensed under a Creative Commons Attribution 4.0 International License (CC BY 4.0). For details of the license, please visit:https://creativecommons.org/licenses/by/4.0/.

 
Peer Review
同行评审
Editorial Services
编辑服务
Research Ethics Policy
研究伦理政策
Contributorship & Authorship
贡献者与署名
Quest Press / Macau Sino-Foreign Medical Publishing Ltd.
关于 Quest Press / Macau Sino-Foreign Medical Publishing Ltd.
Global Indexing
全球索引
Copyright Licensing
版权许可
Data Sharing Policy
数据共享政策
Appeal/Correction/Retraction
申诉/更正/撤回
Online Submission
线上投稿
To the Librarian
致图书馆员
Open Access Statement
开放获取声明
Misconduct Handling Policy
处理不端行为政策
Content Licensing
内容许可
Guidelines for Reviewers
审稿人指南
Quality Control Mechanism
质量把控机制
Academic Misconduct Screening Policy
学术不端筛查政策
Advertising Policy
广告政策
Article Processing Charge (APC)
文章处理费
Publication Ethics Policy
出版伦理政策
Joining the Editorial Board, Associate Editors, Peer Reviewers, and Editor-in-Chief
加入编委、副主编、同行评审专家及主编
Quest Press
Bridging Research to a Global Stage.
academia
© 2025-2026 Quest Press Ltd.
Address: Unit D, 7th Floor, No. 19, Rua de Pa̍k-chiông Vai, Macau
Tel: +853 6881 9699 / Email: QuestPress@hotmail.com
The QUEST PRESS publishes articles under the following open access license.
Quest Press
is a member of the following organizations.